NEP Rapid Shutdown Platform – IV Curve Trace Testing
2024年4月15日
NEP’s RSD platform includes a setting for enabling installers to perform IV Curve Trace Testing. This video shows the use of Seaward test equipment with a CSI 3-phase inverter (the same inverter platform as NEP NEPTUNE).
Based on NEP’s proprietary, PLC based two-way data and control, this testing can be done easily with all equipment installed. This can enable installers and independent engineers to sign off on new installs, and the same process can be used over time to ensure site performance year to year.
Post A Comment